Nevertheless, where No. 3 (8) under the Ministerial Regulation No. 8 (B.E. 2519) issued by the virtue of the Building Control Act B.E. 2479 amended by the Ministerial Regulation No. 9 (B.E. 2521) issued by the virtue of the Building Control Act B.E. 2479 prescribed that the 200 meter line measured from the construction control line shown in the map annexed to the Royal Decree promulgating the Building Control Act B.E. 2479 governing Tambol Bang Lamung, Tambol Nhong Plalai, Tambol Na Klue and Tambol Nhong Prue of Ampur Bang Lamung Chonburi Province B.E. 2521 on the seaside shall be restricted from constructing of any building exceeding 14 meter high from road surface. Therefore, if the Construction Permit No. 162/2007 dated
of construction the building exceeding height limit by the Defendant No. 2. Whilst the Administrative Court of First Instance ordered the provisional measure to cease construction before judgment, the building’s base rocks were built, the construction did not reach the height limit of 14 meter above the road surface. Where the Administrative Court of First Instance issued the order of provisional measure to effect temporary protection by ceasing the entire construction is, therefore, in excess of what reasonable under the circumstances.
Judge of Supreme Administrative Court
No comments:
Post a Comment